Skip to main content
  Translate Website
                      

Building Capacity Data

Our Schools by the Numbers: Building Capacity

As West Mifflin Area School District considers a proposed restructuring plan, two important factors are building capacity and student enrollment. Understanding the difference helps explain why the district is reviewing how its school buildings are being used.

Building Capacity

Building capacity reflects the number of students a school can accommodate while providing appropriate space for classroom instruction, special education, student services, and specialized programs. These needs all factor into determining how much of a building's available space can be used for daily instruction.

Classroom Size

Building capacity and classroom size are two different measurements. While building capacity tells us how many students a school can accommodate, classroom size reflects how many students are assigned to an individual class.

Proposed Class Sizes by Grade Level
Grades K–3 Grades 4–6 Grades 7–12
22
Students per class
25
Students per class
Varies
Based on course demand

Under the proposed restructuring plan, the district is planning for class sizes of 22 students in grades K–3 and 25 students in grades 4–6. Class sizes in grades 7–12 would depend on course enrollment.

The district is also reviewing staffing, student support services, and classroom assignments as part of the planning process. Final arrangements remain subject to further review and Board approval.

Middle School

At the Middle School, more than one-third of the building's available student capacity is currently unused.

Under the proposed restructuring plan, the Middle School would become a K–6 school, with grades K–3 and 4–6 housed in separate areas. This would allow the district to make better use of the building while keeping enrollment within its stated capacity.

Current vs. Proposed Building Use

Current Building Use Proposed Building Use
63.9%
Current Utilization
88.8%
Projected Utilization

Based on current enrollment figures, and assuming enrollment remains unchanged, building utilization would increase from 63.9% to 88.8%.

These projections are especially important when considering the district's long-term enrollment trends. From 2018 to 2026, district enrollment declined by approximately 21%, reinforcing the need to take a closer look at how school buildings and resources are being used.

School restructuring information graphic
School restructuring information graphic

High School

At the High School, 29.4% of the building's student capacity is currently unused.

An important part of the proposed restructuring plan is the district's continued commitment to students from Duquesne. Those currently enrolled at West Mifflin are expected to remain in the district through graduation. As these students graduate, additional space will become available at the High School.

Current and Future Building Capacity

Current Available Capacity Projected Available Capacity
29.4%
Currently Unused
47.7%
After Duquesne Student Graduation

Based on current enrollment figures, once all 222 Duquesne students have graduated, nearly half of the High School's capacity (47.7%) would be available. This projection assumes other enrollment figures remain unchanged.

Proposed Placement of Grades 7 and 8

Following feedback received through the October family survey, the district revised its proposal for seventh- and eighth-grade students. Under the updated plan, these students would attend the High School in a designated area separate from students in grades 9–12, rather than temporarily relocating to Homeville Elementary.

High School building capacity graphic accompanying the proposed restructuring plan.

The proposed configuration would provide seventh- and eighth-grade students with a dedicated learning area while allowing access to academic programs, student services, and extracurricular opportunities available at the High School. The district continues to evaluate building capacity and how space would be allocated among grade levels.

Planning for Future Enrollment

These projections are based on current enrollment numbers and will change as enrollment changes over time. With districtwide enrollment declining approximately 21% since 2018, the proposal reflects the need to make better use of existing school buildings while planning for the district's future.

View the proposed High School floor plan to see how grades 7–12 would be arranged within the building.

School restructuring information graphic
School restructuring information graphic
81 Commonwealth Avenue West Mifflin, PA 15122
Phone: 412-466-9131 / Fax: 412-466-9260
© 2026. West Mifflin Area School District. All Rights Reserved.