At the High School, 29.4% of the building's student capacity is currently unused.
An important part of the proposed restructuring plan is the district's continued commitment to students from Duquesne. Those currently enrolled at West Mifflin are expected to remain in the district through graduation. As these students graduate, additional space will become available at the High School.
Current and Future Building Capacity
|
Current Available Capacity
|
Projected Available Capacity
|
|
29.4%
Currently Unused
|
47.7%
After Duquesne Student Graduation
|
Based on current enrollment figures, once all 222 Duquesne students have graduated, nearly half of the High School's capacity (47.7%) would be available. This projection assumes other enrollment figures remain unchanged.
Proposed Placement of Grades 7 and 8
Following feedback received through the October family survey, the district revised its proposal for seventh- and eighth-grade students. Under the updated plan, these students would attend the High School in a designated area separate from students in grades 9–12, rather than temporarily relocating to Homeville Elementary.
The proposed configuration would provide seventh- and eighth-grade students with a dedicated learning area while allowing access to academic programs, student services, and extracurricular opportunities available at the High School. The district continues to evaluate building capacity and how space would be allocated among grade levels.
Planning for Future Enrollment
These projections are based on current enrollment numbers and will change as enrollment changes over time. With districtwide enrollment declining approximately 21% since 2018, the proposal reflects the need to make better use of existing school buildings while planning for the district's future.
View the proposed High School floor plan to see how grades 7–12 would be arranged within the building.